Downtown Transportation Center


Current Project Drawings



Letter from Rorie Watt, P.E., Deputy Director, CBJ Engineering Department

1.        2005 Municipal Election Voter Information Pamphlet

2.        Aerial Image of the site with proposed building footprint.

3.        SketchUp file of the project. (9.62 MB - huge file, but worth the wait)

4.        Parking Garage Facade Study

5.        Transit Center Design Study

6.        Traffic analysis with existing Main Street configuration

7.        Traffic analysis with proposed Main Street modifications

8.        Main Street Improvements

9.        Geotechnical Report 

10.      Rock Excavation Report

 

home
community
visitors
images
business
jobs
calendar
IMAGE-City and Borough of Juneau
Engineering Department--City and Borough of Juneau